Water: Irrigation
Common Irrigation
Set codification: |
CRERIEGO ??? |
||||
Description: |
Common Irrigation |
||||
Set: |
Technology |
FixedCost[r,t,y]
The FixedCost is based on data from the Costa Rican Institute of Aqueducts and Sewers (AYA), for current and future technologies.
Constant Value |
2.51 US$/km3 |
ResidualCapacity[r,t,y]
It is assumed that the residual capacity is equal to the activity of each technology.
Constant Value |
1.34 [km3] |
Water: DRAT
Set codification: |
CRRIEGOFUT ??? |
||||
Description: |
DRAT |
||||
Set: |
Technology |
CapitalCost[r,t,y]
The capital cost is given in MUS$ per km3, the data is based on the Arenal-Tempisque Irrigation Project and from the project of Water Supply for the Middle basin of the Tempisque River and Coastal Communities (PAACUME project).
Constant Value |
52 MUS$/km3 |
OutputActivityRatiot[r,t,y]
The output of this technology is 40% over the entire time series, for both current and future technologies.
Constant Value |
40% |
FixedCost[r,t,y]
The FixedCost is based on data from the Costa Rican Institute of Aqueducts and Sewers (AYA), for current and future technologies.
Constant Value |
10.3 US$/km3 |